Monday, April 11, 2016
Second Quarter of the 2016 Finish A Long
1. Dottie Angel Frock
This has been on my list a while. The dress is almost done, but the arm holes are huge and show my bra and sides underneath. So I need to draft a pattern and add sleeves to make this wearable.
2.Dresden Mini
I have had this basted and ready for hand quilting for over a year (maybe two). I just need to get to work and do it!
3. Secret Surprise Quilt
The fabric is cut and I have barely started piecing. If I can get the top and backing to the quilter by the end of the quarter I will be excited.
4. My Christmas Tree Skirt
This is currently at the quilters and will need trimmed and bound once it comes home.
5. #stepstepmom quilt
This is also currently at the quilters and will need trimmed, labeled and bound once it comes home.
Hopefully, I can finish a few of these goals before June! :)
~Adrienne
Saturday, January 17, 2015
My 2015 Sewing Goals
2. Orange Pirate Quilt (2007) - Assembled Top 1/11/15
3. Fresh Squeezed Mystery Bag (2008) - Cut and in baggie
4. Halloween Pillowcases (2013) - in WIP drawer
5. Rainbow Rail Fence (2010) - Basted
6. Madrona Road Challenge Pillow (2012) - Top complete, backing/binding chosen in WIP drawer
7. Flannel Squares (????) - Top together and gave to Jodi D. to quilt and donate 1/10/15
8. Aqua and Grey Dresden Mini (2010) - dresdens made needs top completed
9. Charity Nine Patches (2006) - Assembled Top 1/10/15
10. Broncos Majestic Mountains (2006) - Assembled Top 1/11/15
11. Spring Strings Blocks (2005) - Assembled Top 1/11/15
12. Mom's Blue and Yellow top (1990s) - redoing borders
13. Dragon Round Robin (2004) - needs bound
14. Left over B&W flying geese (2009) - Gave away 1/11/15
15. Knitting Bag for Nancy (???) - Mischievous Gnome Messenger Bag Pattern
I have a few other old projects laying around, but these are the ones I am the most motivated to finish. It I could get 12 of these done this year I would be so happy!
Friday, January 17, 2014
Finish Along 2014 Q1 List
1. DQS#14 - This has a due date (1/24), but has been lingering in this state over a month.
2. MQG Madrona Road Challenge - I made a scrappy trip along top and ran out of fabric. So I ordered more then left it sitting.
3. Anni's Red, Aqua, Grey, Pink Quilt - Blocks from swaps all here
4. Eiry's Red, Aqua, Grey, Pink Quilt - Blocks from swaps need two more Scrappy Trip Along blocks
5. Anni's Munki Munki Quilt - Blocks done
6. Eiry's Munki Munki Quilt - Blocks need sashings added
7. Super Old UFO - Charity Nine Patch - Blocks done and need sashing
8. Orange Pirate Quilt - Fabric Cut
9. Mendocino Quilt - Nothing cut, but the fabric has been in a pretty stack waiting for three months
10. Hugs for my helpers - When I am sewing, I normally have one girl on each side of me 'helping'. I need to be calmer and remember they love me and want to be with me and are not actually trying to mess me up while sewing.
Good luck everyone and keep on sewing!
Wednesday, March 13, 2013
Moving to Bloglovin
So please ignore!
Follow my blog with Bloglovin
Sunday, January 29, 2012
I am back!
Eiry and Anni born prematurely on November 1st, 2011.
I have not been sewing much at all since I got pregnant with them as it was a rough pregnancy and I was so uncomfortable. I did get the biding on my RK strawberry quilt.
Insert Photo
I also got three quilts quilted for free by Lovebug Studios... my HR Bee quilt, the Fresh Squeezed top, and a String quilt. The binding is attached to them as of January 1st, 2012, but it will take some time to bind all three. I will post about them as I finish.
I entered the lottery for DQS12 today and hope to get included again. I have so enjoyed it in the past and was very sad not to be able to play last round.
Tuesday, March 1, 2011
February UFO #10
I am also only halfway done with my DQS10 top and am leaving for Europe in 8 days. So we know what I should be working on right now!
Here is the last progress picture I took of it...
It has the rickrack attacked and is laying on the backing (about two feet away staring at me hoping that I get some more work done on it today). All I really have left is the flying geese border and the quilting/binding. If I can get the top finished and basted I can do the rest on the 14 hour plane ride or during my trip. We will see!!!
Tuesday, February 1, 2011
Moving along...
While grocery shopping last week, I happened to look at the clearance isle of football stuff that was reduced since football is over here. While browsing the clearance I found a poly/cotton blend pillow case that will be a perfect center for the Broncos quilt! Yeah, I have pulled out those blocks and they are on my short list.
I am still undecided about the String Swap Blocks, because they are just brightly colored string blocks which I have gotten over already. I think I just need to choose a color and sash them into a top and get it DONE. Maybe aqua or white... hmmmm....
The Variation Stars top is still at the quilters, but I have the binding cut and ironed already. I also still need to get a photo of this.
I am half way done binding the Halloween quilt. It turned out awesome! I used a new quilter Eagle Mounting Quilters and they did a great job on this quilt. I love the lime green thread she chose!
Three of the mini quilts got done in January. Only one left... the Rainbow Rail Fence Mini and I have no idea how to quilt it!
I also finished binding the Brown Bag Challenge Quilt and am looking for a good place to donate it. It is way to girly for this household of boys.
I also started two new projects... a lime/gray quilt for which I have been collecting fabrics over a year and a batik quilt made with some green/blue batiks a friend generously gave to me. Little did she know my unlike of batiks...
I have been pretty sick the last few days and am hoping to get well by Friday because that is the next Sweatshop night at my LQS and I obviously still have lots to do!
Monday, January 17, 2011
Actual Progress...
Broncos Top - I think I have found a center, but it is knit. I am debating on whether it will work as a quilt center if I back it in interfacing or not....
Halloween – I have made the backing and mailed this to a quilter.
Variation Stars – I finished the borders and have made the backing and mailed this to a quilter.
Maple Leaf Mini - This is completely finished and ready to be gifted.
BBCQ - This has a backing and is at the quilters.
The variation stars was drawn by Judy for this months UFO and I finished it first and then kept on going. I am wanting to finish all of my list, but it is such a boring list that I really want to start something new.
I forgot to take photos of most of my completed tops that are now at the quilters... But here is the one I remembered, the Brown Bag Challenge Quilt.
I also managed to complete a ton of blocks for the 3 by 6 Mini Bee (check my Flickr photostream). I made angel blocks from my group from last quarter (4th qtr 2010) because one of our ladies went missing. I also completed the blocks for my ladies this quarter (1st qtr 2011) that are not actually due until March 15th! Woohoo!
I also finished my January blocks for BUZZCUTs for Andrea.
Maybe I can keep up the good work, but I feel the motivation waning...
Sunday, December 19, 2010
12 Things in 2011
So for 2011, I hope to finish 12 UFOs in 12 months (maybe even one each month). Here they are in no particular order...
- Broncos Top - Find Center and make into a top - Found a center
- String Swap Blocks - Combine blocks into a top
- Pirate Quilt - Blocks are cut, but not even started
- Beginner RR - Finish Quilting/Bind
- Triple Four Patch - Baste/Quilt/Bind
- Variation Stars – Borders/Backing/Binding - Done in January
- Halloween – Backing/Quilt/Bind - Done in February
- Rainbow Rail Fence Mini - Quilt/Bind
- Rainbow Stars Mini - Quilt/Bind - Done January
- Double X Mini - Quilt/Bind - Done January
- Maple Leaf Mini - Quilt/Bind - Done January
- BBCQ - Backing/Quilt/Bind - Done January
Monday, November 29, 2010
Finally Done with the ABCs!!!!
I also finished the red quilt from about 5-6 years ago and am thinking of donating it to that blogger 100 quilts challenge thing. Not sure yet....
Red Quilt
Miss Pam's quilt
Ronin's Quilt
Zach's Quilt
Wednesday, November 10, 2010
A little accounting to keep myself honest
My Ongoing Projects:
Three ABC/I-SPY quilts - Need Bound
Variation Star Bee Blocks – Sashing Ideas?!
Halloween Quilt – Needs ironed and a backing made... Border?!?!
Brown Bag Challenge Quilt - Idea Created... now to cut
Last Small Quilt top – half done, but not interesting
Didn't do anything on these:
Charity Nine Patch Yellow – Missing?! Where are these blocks?!
Broncos Quilt – Blocks Made, but I need a center medallion/pillowcase
Orange Pirate Top - Cut PIGS (project in grocery sack)
Completed tops awaiting quilting:
RK Strawberries Top
7 of 9 Small Quilts
Beginner RR
Tops at the quilters:
Spring Strings Top*
HR Bee Top*
Fresh Squeezed Stripes Top*
* sent to LoveBug Studios as part of her 100 quilts challenge without my remembering to take a 'before' photo
This week's stats:
Currently in progress - 6
New projects started - 0
Completed projects - 0
Monday, September 27, 2010
One Thing One Week #3 - Halloween Quilt
I also got a start on sorting the scraps and cutting them into sashing for the 9.5" blocks. Woo hoo!
Maybe I will get the top done by Halloween! Yeah maybe... LOL
Monday, August 30, 2010
DQS9 Finished
I had two ideas and thought I could meld them, but that was a failure. So I just went with my original wagon wheel looking block and then hand stitched some details. I had help choosing a background from the ladies in the Flickr group.
I am also sending a couple of fun homemade sewing accessories including a needle book, a dangle for scissors/rotary cutter and a little needle magnet to hold while sewing. I might send a couple of fun FQs as well.
Monday, August 23, 2010
One thing this week
Tuesday, July 27, 2010
Here is a photo of the top that I finished. I will be quilting once school starts in the middle of August.
Thursday, July 22, 2010
Careful use of my time
I have been busy sewing though...
ABC Quilts (really moving along, but no where near done)
BUZZCUTS Bee (we just started the second year)
DQS9 (half of the piecing is done)
Small Quilts Class (only three more months out of nine)
January - Rail Fence
February - Interwoven
March - Old Maid's Puzzle
April - Lady of the Lake
May - Variable Star
June - Maple Leaf
July - Triangles and Squares
Class is this Saturday the 24th!
Wednesday, June 30, 2010
Accountablity and even more Bee blocks
1. ABC - Ronin
This quilt has the blocks complete and I have started the sashing process. All sashing is cut and half is already attached, but not yet ironed.
Update 7/24 - This quilt top is now done and needs sandwiched and quilted.
Update 12/1 - Finished in November
2. ABC - Zach
This quilt has the blocks complete and I have started the sashing process. All sashing is cut and half is already attached, but not yet ironed. Yes, it is in the same stage as the other as I am working on them simultaneously.
Update 7/27 - This quilt top is now done and needs sandwiched and quilted.
Update 12/1 - Finished in November
3. ABC - School
This quilt has the blocks complete and I have started the sashing process, but I am half a yard short of the sashing material and need to find some more. (Anyone have 1/2 a yard of the White on Black dots from the "That's It" line by Michael Miller that they want to trade with me?)
Update 12/1 - Finished in November
4. Broncos Mountain Majesties
The blocks are done, but I am having a hard time find a cotton pillowcase or flag with a large Broncos emblem on it for the center.
Update 12/1 - Not even touched all year!
5. Bright Strings
This top is complete, but still needs a backing before going to the quilters. I need to find a big enough piece from my stash and prepare that backing.
Update 7/27 - I seamed the backing today.
Update 12/1 - At the Quilters
6. Halloween Quilt from Bee blocks
All the block are now here and I have a layout planned.
Update 12/1 - Top complete needs backing
7. Triple Four Patch
Top, Batting and Backing ready, so why I am I not quilting it yet?!
8. HR Stripe Bee Quilt
Bought sashing for the completed blocks last weekend. Next on my list after the ABC quilts.
Update 12/1 - At the Quilters
9. RK Strawberries Bee Quilt
This top is complete, but still needs a backing before going to the quilters. I bought a bunch of Kona Avocado and plan on putting the one incorrectly sized block off center within the backing.
Update 12/1 - At the Quilters
10. All 9 Minis for Quilter's Studio Class
I missed class in June, but am finished with Jan., Feb., March, April and Mays tops. So halfway done?!
Update 12/1 - Five are completely finished while four still need quilted and bound
Now for a June update on my quilting bee blocks...
BUZZCUTS Quilting Bee was for sunflowerquilt (Jennie) and she sent the gray/black and we added our scraps. I almost had enough to make three whole blocks.
In the Stash Busting Bee Int'l, it was my month and I had the group create the same variation stars as BUZZCUTs made me last month. With over half the blocks here, I am almost ready to start putting that top together. June is the last month so this bee is practically over.
Sew Kid @ Heart II Quilting Bee was for curtiqueen and we made wonky log cabins with her fabric as a focus. I failed to take a photo of the block I made, but it was cute. This was the last month for this swap.
Tuesday, May 25, 2010
Relearning iPhoto to show Bee Blocks
April BUZZCUTs for Sara we made monochromatic blocks from our stash. I got to pick my favorite color... Green.
April SK@H2 for Becca we made cute blocks with her novelty focus fabrics.
April Sweet Dreams Bee for Terrie we made blocks with her fabrics that featured the cutie kids fabric. April was the final month for this bee!
April Stash Busting Int'l for Kyra we made postage stamp blocks. This block took a long time for being simple squares.
In May BUZZCUTs started all over for another year and I got to go first this time! I sent out white fabrics and asked for a blue/green block from everyone following a specific pattern that has recently gotten popular in Flickrland. Check out the linky to see what people have been creating for me!
May SK@H2 for Ida we used her white background and added 2.5" bright squares from our stash.
May Stash Busting Int'l was for Corey and had tons of little (1" finsihed) squares that I added to her lovely grey solid.
For June in the Stash Busting Int'l, it is my month and I am having them make more more of the blocks that BUZZCUTs made for me in May. I should get 24 or so 16" blocks and hope to make a duvet cover for my own bed.
Wednesday, May 19, 2010
I have too much on my mind to organize it there...
Here is all I need to finish by 5/31 or sooner….
1. May ‘Small Quilt’ for class – 240 1.5” HSTs already sewn, but need cut, ironed and pieced into a top (maybe I can cut and iron them tonight)
2. Two more April virtual bee blocks – Ida and Barb (all the pieces are cut, but they need pieced)
3. ABC tops 3X – get the blocks finished and assembled
4. Backing for Green Strawberries quilt (do I even have fabric for this???)
Then I need to get my Modify Tradition ideas sorted out and start working on a top to be mailed around June 8th.
Now that I write it all down it does not seem too bad… LOL If I can get the first three things on my list done at Sweatshop, I would be in a good place. I have to finish the first two because they have actual due dates. The 3rd is harder than it looks and is on my Spring to Finish 2010 Challenge list so I really want to at least get something done on them.
Friday, May 7, 2010
Spring to Finish Challenge 2010
So I joined Jacquie's Spring to Finish Challenge 2010 over at her Tall Grass Studio blog. I joined her last fall and managed to get almost 10 project done before the new year.
I still have so many UFO/WIPs that I am going to try and be conservative this time. I am listing 5 WIPs/UFOs that I think I might actually be able to finish in the allotted time frame.
1. Get my Sew Kid @ Heart top ready for the quilter (finish top, borders and find a backing)
2. Get Ronin's ABC top together (fabrics cut, but that's it)
3. Get Zach's's ABC top together (fabrics cut)
4. Get School Charity ABC top together (fabrics cut)
5. Stay on time with all my VQB blocks for April and May
If I achieve these goals then I am going to cave in and buy the last 5-7 yards of the KJR blue basket weave hidden in the back at my LQS. – ALREADY DONE!
AS I get each project finished, I will try to get a picture up as soon as I can.















