Monday, January 17, 2011

Actual Progress...

I have made progress on a lot of my UFOS...

Broncos Top - I think I have found a center, but it is knit. I am debating on whether it will work as a quilt center if I back it in interfacing or not....

Halloween – I have made the backing and mailed this to a quilter.

Variation Stars – I finished the borders and have made the backing and mailed this to a quilter.

Maple Leaf Mini - This is completely finished and ready to be gifted.

BBCQ - This has a backing and is at the quilters.

The variation stars was drawn by Judy for this months UFO and I finished it first and then kept on going. I am wanting to finish all of my list, but it is such a boring list that I really want to start something new.

I forgot to take photos of most of my completed tops that are now at the quilters... But here is the one I remembered, the Brown Bag Challenge Quilt.
Brown Bag Challenge Quilt

I also managed to complete a ton of blocks for the 3 by 6 Mini Bee (check my Flickr photostream). I made angel blocks from my group from last quarter (4th qtr 2010) because one of our ladies went missing. I also completed the blocks for my ladies this quarter (1st qtr 2011) that are not actually due until March 15th! Woohoo!

I also finished my January blocks for BUZZCUTs for Andrea.
Buzzcuts January 2011

Maybe I can keep up the good work, but I feel the motivation waning...

Sunday, December 19, 2010

12 Things in 2011

So I have seen a bunch of people putting up challenges for completing UFOs in 2011. Don't we try to do that every year? I need to go back and see if I did that for 2010 and how well I accomplished it.

So for 2011, I hope to finish 12 UFOs in 12 months (maybe even one each month). Here they are in no particular order...
  1. Broncos Top - Find Center and make into a top - Found a center
  2. String Swap Blocks - Combine blocks into a top
  3. Pirate Quilt - Blocks are cut, but not even started
  4. Beginner RR - Finish Quilting/Bind
  5. Triple Four Patch - Baste/Quilt/Bind
  6. Variation Stars – Borders/Backing/Binding - Done in January
  7. Halloween – Backing/Quilt/Bind - Done in February
  8. Rainbow Rail Fence Mini - Quilt/Bind
  9. Rainbow Stars Mini - Quilt/Bind - Done January
  10. Double X Mini - Quilt/Bind - Done January
  11. Maple Leaf Mini - Quilt/Bind - Done January
  12. BBCQ - Backing/Quilt/Bind - Done January
The larger quilts I hope to get the tops completed and backings ready and maybe I can afford to have one quilted every other month (I have three tops with backings in line already). I hope to finish the quilting and binding on the smaller ones myself.

Monday, November 29, 2010

Finally Done with the ABCs!!!!

I have finally finished the three ABC quilts that have taken over my quilting life for the last 6 or so months. I took the quilted tops to my mom's for Thanksgiving and managed to get them all bound before leaving Texas. I used up pieces of binding left over from other quilts so each of the three ABC tops has a very scrappy binding. The quilts are so scrappy to begin with that I thought this would be a great way to use up more scraps.

ABC Quilts +1

I also finished the red quilt from about 5-6 years ago and am thinking of donating it to that blogger 100 quilts challenge thing. Not sure yet....

Red Quilt
Red Nines Charity Quilt

Miss Pam's quilt
For the boy's teacher

Ronin's Quilt
IMGP5269

Zach's Quilt
IMGP5268

Wednesday, November 10, 2010

A little accounting to keep myself honest

My Ongoing Projects:
Three ABC/I-SPY quilts - Need Bound

Variation Star Bee Blocks – Sashing Ideas?!

Halloween Quilt – Needs ironed and a backing made... Border?!?!

Brown Bag Challenge Quilt - Idea Created... now to cut

Last Small Quilt top – half done, but not interesting


Didn't do anything on these:
Charity Nine Patch Yellow – Missing?! Where are these blocks?!

Broncos Quilt – Blocks Made, but I need a center medallion/pillowcase

Orange Pirate Top - Cut PIGS (project in grocery sack)


Completed tops awaiting quilting:
RK Strawberries Top

7 of 9 Small Quilts

Beginner RR


Tops at the quilters:
Spring Strings Top*

HR Bee Top*

Fresh Squeezed Stripes Top*

* sent to LoveBug Studios as part of her 100 quilts challenge without my remembering to take a 'before' photo


This week's stats:

Currently in progress - 6
New projects started - 0
Completed projects - 0

Monday, September 27, 2010

One Thing One Week #3 - Halloween Quilt

Once again Amy at Amy's Creative Side has challenged us to finish one thing in the last week. So I joined in and choose designing my Halloween quilt. I got the blocks from two virtual quilting bees so all my friends made them (plus I added a few to get the right number). The block sizes are unfisished 6.5", 9.5" and 12.5". So I had some finagling to do!

IMGP5207

I also got a start on sorting the scraps and cutting them into sashing for the 9.5" blocks. Woo hoo!

IMGP5208

Maybe I will get the top done by Halloween! Yeah maybe... LOL

Monday, August 30, 2010

DQS9 Finished

I did finish my DQS9 last week and will be mailing it today with some fun extras.

DQS9 Finished

I had two ideas and thought I could meld them, but that was a failure. So I just went with my original wagon wheel looking block and then hand stitched some details. I had help choosing a background from the ladies in the Flickr group.

I am also sending a couple of fun homemade sewing accessories including a needle book, a dangle for scissors/rotary cutter and a little needle magnet to hold while sewing. I might send a couple of fun FQs as well.

Monday, August 23, 2010

One thing this week

Once again Amy at Amy's Creative Side has challenged us to finish one thing in one week. So I had to join in and choose finishing my DQS9 and sending it by Saturday. Honestly, the binding is 3/4 finished and I have an idea for the label and extras so this should be simple. But who knows what life will throw me in the next week!

Amy's Creative Side