I have so many UFOs that I want to be held accountable and join The Littlest Thistle's Finish Along 2014 Q1. With my cancer surgery and radiation, I might not finish all these in Q1, but it is nice to have them all in one place and I can always move them to the next Quarter!
1. DQS#14 - This has a due date (1/24), but has been lingering in this state over a month.
2. MQG Madrona Road Challenge - I made a scrappy trip along top and ran out of fabric. So I ordered more then left it sitting.
3. Anni's Red, Aqua, Grey, Pink Quilt - Blocks from swaps all here
4. Eiry's Red, Aqua, Grey, Pink Quilt - Blocks from swaps need two more Scrappy Trip Along blocks
5. Anni's Munki Munki Quilt - Blocks done
6. Eiry's Munki Munki Quilt - Blocks need sashings added
7. Super Old UFO - Charity Nine Patch - Blocks done and need sashing
8. Orange Pirate Quilt - Fabric Cut
9. Mendocino Quilt - Nothing cut, but the fabric has been in a pretty stack waiting for three months
10. Hugs for my helpers - When I am sewing, I normally have one girl on each side of me 'helping'. I need to be calmer and remember they love me and want to be with me and are not actually trying to mess me up while sewing.
Good luck everyone and keep on sewing!
Brand Ambassador Intro - Becky Jorgensen
1 year ago