Monday, August 23, 2010
One thing this week
Tuesday, July 27, 2010
Here is a photo of the top that I finished. I will be quilting once school starts in the middle of August.
Thursday, July 22, 2010
Careful use of my time
I have been busy sewing though...
ABC Quilts (really moving along, but no where near done)
BUZZCUTS Bee (we just started the second year)
DQS9 (half of the piecing is done)

Small Quilts Class (only three more months out of nine)
January - Rail Fence

February - Interwoven

March - Old Maid's Puzzle

April - Lady of the Lake

May - Variable Star

June - Maple Leaf

July - Triangles and Squares
Class is this Saturday the 24th!
Wednesday, June 30, 2010
Accountablity and even more Bee blocks
1. ABC - Ronin
This quilt has the blocks complete and I have started the sashing process. All sashing is cut and half is already attached, but not yet ironed.
Update 7/24 - This quilt top is now done and needs sandwiched and quilted.
Update 12/1 - Finished in November
2. ABC - Zach
This quilt has the blocks complete and I have started the sashing process. All sashing is cut and half is already attached, but not yet ironed. Yes, it is in the same stage as the other as I am working on them simultaneously.
Update 7/27 - This quilt top is now done and needs sandwiched and quilted.
Update 12/1 - Finished in November
3. ABC - School
This quilt has the blocks complete and I have started the sashing process, but I am half a yard short of the sashing material and need to find some more. (Anyone have 1/2 a yard of the White on Black dots from the "That's It" line by Michael Miller that they want to trade with me?)
Update 12/1 - Finished in November
4. Broncos Mountain Majesties
The blocks are done, but I am having a hard time find a cotton pillowcase or flag with a large Broncos emblem on it for the center.
Update 12/1 - Not even touched all year!
5. Bright Strings
This top is complete, but still needs a backing before going to the quilters. I need to find a big enough piece from my stash and prepare that backing.
Update 7/27 - I seamed the backing today.
Update 12/1 - At the Quilters
6. Halloween Quilt from Bee blocks
All the block are now here and I have a layout planned.
Update 12/1 - Top complete needs backing
7. Triple Four Patch
Top, Batting and Backing ready, so why I am I not quilting it yet?!
8. HR Stripe Bee Quilt
Bought sashing for the completed blocks last weekend. Next on my list after the ABC quilts.
Update 12/1 - At the Quilters
9. RK Strawberries Bee Quilt
This top is complete, but still needs a backing before going to the quilters. I bought a bunch of Kona Avocado and plan on putting the one incorrectly sized block off center within the backing.

Update 12/1 - At the Quilters
10. All 9 Minis for Quilter's Studio Class
I missed class in June, but am finished with Jan., Feb., March, April and Mays tops. So halfway done?!
Update 12/1 - Five are completely finished while four still need quilted and bound
Now for a June update on my quilting bee blocks...
BUZZCUTS Quilting Bee was for sunflowerquilt (Jennie) and she sent the gray/black and we added our scraps. I almost had enough to make three whole blocks.

In the Stash Busting Bee Int'l, it was my month and I had the group create the same variation stars as BUZZCUTs made me last month. With over half the blocks here, I am almost ready to start putting that top together. June is the last month so this bee is practically over.
Sew Kid @ Heart II Quilting Bee was for curtiqueen and we made wonky log cabins with her fabric as a focus. I failed to take a photo of the block I made, but it was cute. This was the last month for this swap.
Tuesday, May 25, 2010
Relearning iPhoto to show Bee Blocks
April BUZZCUTs for Sara we made monochromatic blocks from our stash. I got to pick my favorite color... Green.

April SK@H2 for Becca we made cute blocks with her novelty focus fabrics.

April Sweet Dreams Bee for Terrie we made blocks with her fabrics that featured the cutie kids fabric. April was the final month for this bee!

April Stash Busting Int'l for Kyra we made postage stamp blocks. This block took a long time for being simple squares.

In May BUZZCUTs started all over for another year and I got to go first this time! I sent out white fabrics and asked for a blue/green block from everyone following a specific pattern that has recently gotten popular in Flickrland. Check out the linky to see what people have been creating for me!
May SK@H2 for Ida we used her white background and added 2.5" bright squares from our stash.

May Stash Busting Int'l was for Corey and had tons of little (1" finsihed) squares that I added to her lovely grey solid.

For June in the Stash Busting Int'l, it is my month and I am having them make more more of the blocks that BUZZCUTs made for me in May. I should get 24 or so 16" blocks and hope to make a duvet cover for my own bed.
Wednesday, May 19, 2010
I have too much on my mind to organize it there...
Here is all I need to finish by 5/31 or sooner….
1. May ‘Small Quilt’ for class – 240 1.5” HSTs already sewn, but need cut, ironed and pieced into a top (maybe I can cut and iron them tonight)
2. Two more April virtual bee blocks – Ida and Barb (all the pieces are cut, but they need pieced)
3. ABC tops 3X – get the blocks finished and assembled
4. Backing for Green Strawberries quilt (do I even have fabric for this???)
Then I need to get my Modify Tradition ideas sorted out and start working on a top to be mailed around June 8th.
Now that I write it all down it does not seem too bad… LOL If I can get the first three things on my list done at Sweatshop, I would be in a good place. I have to finish the first two because they have actual due dates. The 3rd is harder than it looks and is on my Spring to Finish 2010 Challenge list so I really want to at least get something done on them.
Friday, May 7, 2010
Spring to Finish Challenge 2010
So I joined Jacquie's Spring to Finish Challenge 2010 over at her Tall Grass Studio blog. I joined her last fall and managed to get almost 10 project done before the new year.
I still have so many UFO/WIPs that I am going to try and be conservative this time. I am listing 5 WIPs/UFOs that I think I might actually be able to finish in the allotted time frame.
1. Get my Sew Kid @ Heart top ready for the quilter (finish top, borders and find a backing)
2. Get Ronin's ABC top together (fabrics cut, but that's it)
3. Get Zach's's ABC top together (fabrics cut)
4. Get School Charity ABC top together (fabrics cut)
5. Stay on time with all my VQB blocks for April and May
If I achieve these goals then I am going to cave in and buy the last 5-7 yards of the KJR blue basket weave hidden in the back at my LQS. – ALREADY DONE!
AS I get each project finished, I will try to get a picture up as soon as I can.

